Factory Verification Service
Reduce sourcing risks through professional factory audits
Former BYD factory manager conducts on-site verification of EV charging manufacturers. We check certifications, production capability, QC processes, and export experience using OEM-level evaluation standards.
What We Verify
Every verification follows the same standards I used at BYD for supplier evaluation.
Certifications
Verify UL2251, IEC 62196, CE, TUV, CCC certificates are real and current. Check certificate numbers against official databases. Confirm factory name matches certificate holder.
Production Lines
Inspect injection molding machines, cable assembly lines, testing equipment. Verify production capacity matches claimed output. Check equipment maintenance and calibration records.
QC Process
Review incoming inspection, in-process control, final testing procedures. Check quality documentation and traceability systems. Verify testing equipment for EV-specific safety tests.
OEM Capability
Assess custom tooling capability, packaging design, logo printing, private labeling. Check MOQ flexibility and tooling cost structure. Review previous OEM projects.
Export Experience
Verify international shipping experience, customs documentation capability, overseas client references. Check English communication ability and responsiveness.
Safety Compliance
Confirm understanding of EV safety standards (UL2251, IEC 62196). Check high-voltage testing capability. Verify material compliance (RoHS, REACH).
Verification Process
Submit Factory Information
Provide factory name, location, and products. Or let us recommend verified suppliers based on your requirements.
On-Site Visit
We conduct on-site factory visit within 3-5 business days. Inspection takes 2-4 hours depending on factory size and complexity.
Detailed Report
Receive comprehensive verification report with photos, findings, and risk assessment. Report includes production line photos, certificate verification, and capability evaluation.
Recommendation
Clear recommendation: Proceed (low risk), Proceed with Caution (medium risk with mitigation steps), or Avoid (high risk).
Service Options
Certificate verification and basic capability review
- Certificate authenticity check
- Production capability review
- Basic recommendation
On-site visit with detailed verification report
- On-site factory visit (2-4 hours)
- Production line inspection
- QC process review
- Detailed photo report (20-30 photos)
- Risk assessment and recommendation
Why Factory Verification Matters
Common Problems Without Verification
- Fake certifications (UL/CE certificates that don't exist)
- Quality inconsistency between samples and bulk orders
- Production capacity misrepresentation
- Safety compliance issues discovered after shipment
Benefits of Professional Verification
- Avoid suppliers with fake certifications
- Confirm production capability before large orders
- Reduce quality inconsistency risks
- Make informed sourcing decisions with data
Request Factory Verification
Submit factory details or let us recommend verified suppliers based on your requirements.
Get Started